Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Agbulos, A, Mohamed, Y, Al-Hussein, M, AbouRizk, S and Roesch, J (2006) Application of Lean Concepts and Simulation Analysis to Improve Efficiency of Drainage Operations Maintenance Crews. Journal of Construction Engineering and Management, 132(03), 291–9.

El Wardani, M A, Messner, J I and Horman, M J (2006) Comparing Procurement Methods for Design-Build Projects. Journal of Construction Engineering and Management, 132(03), 230–8.

El-Diraby, T E (2006) Web-Services Environment for Collaborative Management of Product Life-Cycle Costs. Journal of Construction Engineering and Management, 132(03), 300–13.

Ellis, R D and Lee, S (2006) Measuring Project Level Productivity on Transportation Projects. Journal of Construction Engineering and Management, 132(03), 314–20.

Hinze, J, Devenport, J N and Giang, G (2006) Analysis of Construction Worker Injuries That Do Not Result in Lost Time. Journal of Construction Engineering and Management, 132(03), 321–6.

Kaiser, M J (2006) Offshore Decommissioning Cost Estimation in the Gulf of Mexico. Journal of Construction Engineering and Management, 132(03), 249–58.

Lee, D and Arditi, D (2006) Automated Statistical Analysis in Stochastic Project Scheduling Simulation. Journal of Construction Engineering and Management, 132(03), 268–77.

Soetanto, R, Dainty, A R, Glass, J and Price, A D (2006) Empirical Evaluation of Structural Frame Performance Criteria: Realizing the Potential of Hybrid Concrete Construction. Journal of Construction Engineering and Management, 132(03), 278–90.

Tang, W, Duffield, C F and Young, D M (2006) Partnering Mechanism in Construction: An Empirical Study on the Chinese Construction Industry. Journal of Construction Engineering and Management, 132(03), 217–29.

Wibowo, A (2006) CAPM-Based Valuation of Financial Government Supports to Infeasible and Risky Private Infrastructure Projects. Journal of Construction Engineering and Management, 132(03), 239–48.

Zhang, H, Li, H and Tam, C M (2006) Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints. Journal of Construction Engineering and Management, 132(03), 259–67.